Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Weger Air Solutions helps keep swimming comfortable

Swimming pools require new ventilation and dehumidification plan every 20 to 25 years or so because of corrosion problems caused by the high levels of moisture and chemicals in the air. Such was the case at Kennet Leisure Centre in Berkshire.

Kennet Leisure Centre in Berkshire

Weger Air Solutions supplied and assembled a new air-handling/dehumidification unit rated at 7.28 m3/s. The new Weger unit featured a duplex heat recuperator section, carefully selected to achieve an efficiency of 96.5% at design conditions and recovering an impressive 296kW.

The unit was supplied partly in sections and in and in “flat-pack” components capable of passing through an opening of 2.5m x 1.2m. The onsite assembly of the final until only took three days to meet a very tight project programme.

The new Weger unit was fitted with a comprehensive controls package, enabling it to work from 100% fresh air to 100% recirculation. The controls are set to achieve a pool hall temperature of 30’C and a relative humidity of 60%, as recommended by the English Sports Council.

www.weger-air.co.uk

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted.